1995 YZ 80 -Completely refinished
from the frame up.The bike was fully disassembled and ever piece on it
examined and either refurbished or replaced. -Motor is bored 2
over, has less than 30 minutes on it. It has been run in a little,
jetted and ridden enough to make sure it shifts properly and runs well. .
-Rebuilt front forks - Rebuilt rear shock - All chassis bearings are new ....suspension linkage, swingarm bearings, shock bearings. - New chain and sprockets with 2 teeth bigger on final drive sprocket -
Front and rear brake systems completely rebuilt....new master cylinder
kits installed, calipers were disassembled, cleaned in a hot tank and
re-assembled with new pistons and seals and brake pads. - Frame, subframe, swingarm, triple clamps and all misc brackets and levers have been refinished - Many new chassis bolts are new - refinished rims and hubs - new wheel bearings front and rear - new Dunlop Mx51 tires front and back (never been ridden on.) - new tubes
|